![]() Depending on the type of the project, there may be several such lists or just only one. The BIM Coordinator, as one of the people responsible for creating this manual, is responsible for ensuring the correct implementation of BEP and controlling the quality of the created documentation.Ĭhecklists for the BIM Coordinator are nothing more than a tool thanks to which he is able to standardize the performance of repetitive activities and verify the content of BIM models at a specific stage of project development. This document is a map and, at the same time, a manual describing how BIM will be implemented in the project in order to achieve the goals set by the client. As a result of those analysis BEP is created ( more about BEP here). ![]() These requirements are carefully analyzed by the design team and contractor. ![]() In a properly implemented BIM project, the responsibility of the client is to precisely define the requirements for the content of BIM models at the appropriate stages of the project implementation.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |